Genesis GV Forums banner
1 - 5 of 5 Posts

·
Registered
Joined
·
397 Posts
Discussion Starter · #1 ·
Tire Wheel Land vehicle Vehicle Car


Genesis hasn't released range numbers yet for the GV70 EV but they have shared information of charging specs.

  • 350 kW rapid charging
  • 10% to 80% charge in under 20 minutes
  • 400V/800V multi-rapid charging system
  • V2L (Vehicle to Load) feature that supports a 3.6kW charge


Range estimates for the North American market will be available closer to launch. The addition of 350kW rapid charging, meanwhile, enables the battery to charge from 10% to 80% in under 20 minutes.

Furthermore, Genesis’ application of a 400V/800V multi-rapid charging system will allow drivers to utilize various forms of charging infrastructure. The multi-rapid charging system enables fast and stable charging by raising the voltage supplied by typical chargers from 400V to 800V. The technology is optimized for the vehicle's system thanks to the model's driving motors and inverters. Customers can use the 800V rapid charging system to utilize both 400V and 800V charging infrastructure without the need for an additional converter.

The electric version of the GV70 also includes a V2L (Vehicle to Load) feature that supports a 3.6kW charge, which is higher than the power supply in the average home, enabling customers to conveniently use electric appliances outside of the vehicle.
 

·
Registered
Joined
·
10 Posts
Thank you for the above information. This is the model I am most interested in. I wonder when it will be available in Canada?
I wonder the same (But need a charger installed first), my best guess is spring or summer 2022. The Alabama plant where it will be built should start churning them out in Q1 or Q2...
 
1 - 5 of 5 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top